QC STAFF KEEPING TRACK OF EACH STEP
|
|||
Step1
|
Plastic raw material (typically in powder form) is placed inside a mold (cast aluminum, CNC machined aluminum)
|
||
Step2
|
The mold is attached to an arm of a rotational molding machine, and enters the oven where it rotates (rotational molding) on two axes.
|
||
Step3
|
As the plastic material melts, it begins to adhere to the inside mold walls, building wall thickness and taking on the shape and texture of the interior mold surface.
|
||
Step4
|
After rotating in the oven, the mold enters the cooling phase, where the molten material eventually solidifies into the finished, hollow plastic part.
|
||
Step5
|
The part is then removed from the mold, where it undergoes a variety of secondary operations (trimming, foam-filling, assembly, etc.) prior to shipment.
|
Standard:SGS Number:SHAHG1006895601 Issue Date:2021-05-27 Scope/Range:PE-MULTI-FUNCTIONAL PLASTICS Issued By:SGS SA |
Standard:SGS Number:SHAHG1006895601 Issue Date:2021-05-27 Scope/Range:PE-MULTI-FUNCTIONAL PLASTICS Issued By:SGS SA |
Standard:SGS Number:CANEC0902239001 Issue Date:2021-05-05 Scope/Range:POLYURETHANE FOAMING Issued By:SGS SA |
Standard:SGS Number:CANEC0902239001 Issue Date:2021-05-05 Scope/Range:POLYURETHANE FOAMING Issued By:SGS SA |
Standard:SGS Number:CANEC0902239001 Issue Date:2021-05-05 Scope/Range:POLYURETHANE FOAMING Issued By:SGS SA |
Contact Person: Mrs. Wendy
Tel: 86-17701217356
Fax: 86-021-80127278